Discover HeatCore AI

Structural steel fabrication and erection · reference card

Weld monitoring for structural steel fabrication

Shop-fabricated and site-erected steel under AWS D1.1 and EN 1090-2. The four monitoring pain points that cost structural fabricators most, and which Therness signal addresses each.

Industry
Structural steel fabrication and erection
Dominant processes
Gas metal arc welding on shop-fabricated beams, columns and connections; Flux-cored arc welding for site erection and field welds; Submerged arc welding on heavy plate girders and built-up sections; Shielded metal arc welding for site tie-ins and repair work

Structural steel fabrication splits cleanly into a shop half and a site half, and the two see different conditions under the same code. A shop weld is made indoors, at a fixed station, by a welder qualified to that exact procedure. A site weld on the same structure happens in wind, cold or rain, on a connection that may be harder to reach and impossible to re-position.

EN 1090-2’s execution classes and AWS D1.1’s inspection categories exist because not every connection carries the same consequence if it fails — a primary bracing member is not a secondary purlin — and the inspection and documentation burden is meant to track that difference. A fabricator that applies one inspection intensity everywhere either wastes effort on low-consequence connections or under-documents the ones that matter.

Heavy plate work adds its own failure mode: a long multi-pass seam can drift in interpass temperature over the course of a welding day without anyone noticing, because nothing before the pass or after it looks different — only the record of what happened between passes shows it. See the EN 1090-2 execution guide for how execution class is decided before a single connection is welded.

Governing codes

Documents that govern welding in structural steel fabrication and erection, and why each one is in scope
CodeWhy it applies
AWS D1.1Structural Welding Code — Steel, the dominant code for building and bridge steel fabricated to the US route.
EN 1090-2Execution standard for steel structures on the CE-marking route, setting execution classes tied to consequence of failure.
ISO 5817The quality-level standard EN 1090-2 and many structural specifications point to for weld imperfections.
ISO 3834-2The comprehensive quality-system part EN 1090-2 invokes at the higher execution classes; lower classes map to EN ISO 3834-3 or -4.

Monitoring pain points

What goes wrong, what it costs, and the signal that sees it early
Pain pointConsequenceSignal that sees it
Execution class drives a different inspection and qualification burden per connectionA fabricator that treats every connection the same either over-inspects the low-consequence ones or under-documents the critical ones.Process evidence tagged to the connection and its execution class as the weld is made, not sorted afterward.
Site welds happen in wind, cold and rain that a shop weld never seesA procedure qualified indoors drifts outside its window on an exposed erection site without anyone measuring it.Preheat and interpass measurement taken at the joint on site, not assumed from the shop procedure.
Heavy plate girders carry many passes across a long welding dayInterpass temperature creeps upward through the day and the later passes sit outside the qualified range.Interpass measured on every pass and trended across the whole joint, not spot-checked once.
A steel erector's traceability spans shop welds, site welds and multiple subcontracted crewsAssembling the as-built welding record for handover becomes a manual reconciliation exercise.Weld identifier, welder, procedure and process record joined automatically regardless of where the weld was made.

What that means for the cell

Bring the evidence forward, not the inspection

Therness measures what happens while the arc is running — parameters, thermal signature, per-weld records — so the problems on this page surface on the shift that made them.

Progetto cofinanziato nell'ambito del PR Piemonte FSE+ 2021-2027,
Priorità I, Obiettivo Specifico a), Azione 4 – "Sostegno alla nascita delle start up"