Free tool · no sign-up
Welding cost calculator
Enter what the joint needs and what you pay, and read the cost of a metre of weld and of one whole joint, split into labour, consumable, shielding gas and electricity. Every price field starts empty: there is no price table in this page, no market rate and no currency conversion, so the answer is in whatever currency you typed.
The two divisions that do the real work are deposition rate, which turns kilograms into arc time, and operating factor, which turns arc time into paid time. They are usually why two shops quoting the same drawing land a long way apart.
Two divisions, four prices, one total
Arc time tarc = mdep / DR, in hours per metre
Welder time tlab = tarc / OF
Labour = tlab · labour rate
Consumable = mdep / edep · consumable price
Shielding gas = flow · 60 · tarc / 1000 · gas price, with flow in l/min and the price per m³
Electricity = (I · V / 1000) / eps · tarc · price per kWh
Total cost per metre = labour + consumable + gas + electricity; cost per joint = cost per metre · length
mdep = deposited weld metal per metre · DR = deposition rate in deposited kg per arc hour · OF = operating factor · edep = deposition efficiency · eps = power source efficiency · the three efficiencies are fractions in the formulas and percentages in the fields above
Nothing above is proprietary and nothing is looked up. It is the arc-welding cost relation as it is taught in the economics chapter of the AWS Welding Handbook and in the welding-economics material of the IIW and EWF welding engineer syllabus: quantities first, prices last. The only reason the same joint costs two different amounts in two shops is that the four quantities differ, and three of the four are measurements the shop owns.
One caveat on the electricity term, and it is a real one. Current multiplied by voltage is the product of two averages, which is not the average of the instantaneous product. On pulsed transfer and on other waveform-controlled processes the two differ, and the difference goes the way that makes an averaged reading understate the true mean power. ISO/TR 18491 is the reference family for how welding energy should be measured; this page computes with the two numbers you give it and states the limitation rather than pretending to correct for it.
How to calculate welding cost per metre and per joint
From a joint you have to weld to the money it costs, using your own prices and no one else.
- Start from the deposited metal, not the joint drawing. Enter the weld metal that ends up inside the joint, in kilograms per metre. The weld joint volume calculator produces that number from a preparation; a fillet or a groove read straight off a drawing is not it until the cross-section has been worked out.
- Enter a deposition rate, not a melting rate. Deposited kilograms per arc hour, after spatter and slag. This single input sets the arc time and therefore the labour bucket, so a melting rate pasted in from a wire chart makes the whole page read low.
- Declare your losses and your idle time. Deposition efficiency and operating factor both start at 100 %, which declares no loss and no idle time. Leaving them there returns a floor, and the tool says so. Type the efficiency from the consumable data sheet and the operating factor you have measured on the job.
- Price only what you know. Every price field is empty. Fill the ones you have and the tool names the buckets you left out rather than quietly treating them as free. Use one currency throughout: the calculator has no exchange rate and no price list.
- Add the gas and the electricity if they are in scope. Flowmeter setting and gas price for the shielding bucket; mean current, arc voltage, power source efficiency and the kWh price for the electricity bucket. Both are charged for arc time only, which is a floor for gas and excludes idle draw for power.
- Read the split before the total. The badge under the results gives the percentage each bucket contributes. That split is what tells you whether the next improvement is a cheaper consumable, a faster process or a better organised bay, and it is more useful than the absolute number above it.
- Deposition rate is not melting rate. Melting rate is everything that passed through the arc; deposition rate is the part that stayed in the joint. Entering the first where the second belongs shortens the arc time, shortens the welder time and shrinks the largest bucket on the page. The deposition rate calculator returns the right one as its primary result.
- The neutral defaults are floors, not estimates. Deposition efficiency, operating factor and power source efficiency all start at 100 %, because a default that assumed a loss would flatter one shop and insult another. Left at 100 they declare no spatter, no idle time and no conversion loss, and the tool badges the result as a floor for exactly as long as they stay there.
- The consumable bucket is metal bought, not metal deposited. Deposited mass divided by the deposition efficiency is what leaves the store. The weld joint volume calculator produces both numbers from a preparation, and a fit-up gap wider than the drawing shows up there before it shows up here.
- Gas and electricity are charged for arc time only. Pre-flow, post-flow, purging, leaks and the heel left in a cylinder are all real gas that this calculation does not carry, and the power a machine draws between arcs is real energy it does not carry either. Both buckets are therefore lower bounds, which is the honest direction for a figure that goes into a quotation.
- Cost per metre is a comparison instrument. Its absolute value depends on a labour rate that is a policy decision, so the defensible use is a difference: the same joint, the same prices, one variable changed. Two runs of this page answer a procedure question that no single run can.
- What it costs to weld it once is not what it costs to get it right. Rework, re-inspection and scrap sit outside every bucket on this page, and for most fabricators they are larger than all four together. That is a detection problem rather than an arithmetic one, and it is what welding parameter monitoring and the weld defect cost article deal with.
For the cost that is not on this page at all, the cost of getting the weld wrong, read weld defect cost: scrap, rework and liability.
Questions engineers ask about this calculation
How do you work out the cost of one metre of weld?
Four quantities and four prices, and the quantities come first. The deposited weld metal per metre divided by the deposition efficiency is the filler that has to be bought per metre; multiplied by the consumable price that is the consumable bucket. The same deposited mass divided by the deposition rate is the arc time per metre; divided again by the operating factor it is the paid welder time, and multiplied by the labour rate it is the labour bucket. Shielding gas is the flowmeter setting multiplied by the arc time, priced per cubic metre. Electricity is the arc power divided by the power source efficiency, multiplied by the arc time and by the price per kilowatt hour. Add the four and multiply by the joint length for the cost of a joint. This is the ordinary arc-welding cost relation from welding-economics teaching, not a proprietary model.
Why does the operating factor move the answer more than the price of the wire?
Because it divides the largest bucket. Welder time is arc time divided by the operating factor, so halving the factor doubles the labour charged against the same weld, while the consumable, gas and electricity buckets are untouched by it. A shop that improves fit-up, staging or handling changes its cost per metre without changing a single price it pays. Run the calculator twice with two operating factors and the same prices to see the size of that lever on your own joint; the split badge under the results tells you how much of the total is exposed to it.
What exactly counts as arc-on time when you measure an operating factor?
Only the time the arc is actually burning on production welds. Positioning, fit-up, tacking, slag removal, wire and electrode changes, waiting for a crane, reading the drawing, breaks and inspection are all paid time with no arc, and every one of them belongs in the denominator rather than the numerator. The measurement is the same either way you take it: a shift stopwatch, or an arc-on counter in the power source or in a parameter recorder. What breaks the number is scope, not precision, because a factor measured over one long seam and a factor measured over a shift of short welds are two different quantities that share a name.
Does electricity actually matter in the cost of arc welding?
Enter the numbers and read the split rather than trusting a rule of thumb, because the answer depends entirely on your labour rate and your tariff. What is structurally true is that the electricity bucket scales with arc time exactly as the labour bucket does, so it never overtakes labour by getting bigger; it only looks larger when the labour rate is low or when the tariff is high. The calculator prices the energy the arc consumes over the arc time. It does not price the power the machine, the fume extraction and the cooler draw between arcs, which on a low duty cycle can be a comparable amount of energy for no weld at all.
Should the labour rate be the welder wage or a fully loaded shop rate?
Whichever one you can defend, and the same one every time you use this page. A bare wage answers the question of what the welding itself costs and is the right input for comparing two procedures on the same shop floor. A fully loaded rate, carrying employment costs, supervision, floor space, machine depreciation and consumable handling, answers the question of what the joint costs the business and is the right input for a quotation. The tool adds no overhead of its own, so whatever you type is exactly what the labour bucket contains, and a cost per metre quoted without saying which rate produced it is not comparable to anyone else.
How much shielding gas does a metre of weld really consume?
More than this calculation returns, and the gap is worth measuring. The tool charges the flowmeter setting for the arc time alone, which is the gas that does the shielding. Real consumption also includes pre-flow and post-flow on every start and stop, the surge that a torch releases when the trigger is pulled after an idle period, back-purging on a root pass, gas lost to a leaking hose or a loose fitting, and the heel left in a cylinder when it is changed. On short welds with many starts the arc-time figure can be a small fraction of what the cylinder register shows. Comparing the calculated volume against cylinders actually consumed over a month is the cheapest audit in this list.
Which costs does this calculator deliberately leave out?
Edge preparation and cutting, tacking, fixtures, pre-heat and post-weld heat treatment, back-purge gas, inspection and non-destructive testing, rework and scrap, cylinder or bundle rental, machine depreciation, and every overhead that you do not fold into the labour rate yourself. It also leaves out the cost of getting the weld wrong, which for most fabricators is larger than everything on this page put together. The output is the cost of laying sound metal in a joint once, under the assumptions you typed, and it is deliberately a floor rather than a full works cost.
Can this page be used to compare two welding procedures?
Yes, and that is the comparison it is best at, provided you change one thing at a time. Cost the same joint twice with the same prices and vary only the quantities that the procedure change actually moves: a different preparation changes the deposited metal per metre, a different process or wire changes the deposition rate and the deposition efficiency, mechanisation changes the operating factor. The difference between the two totals is the real subject, and it is far more robust than either absolute figure, because a labour rate that is wrong by the same amount in both runs cancels out of the difference and does not cancel out of the totals.
Every number above is an assumption until something measures it.
Deposition rate, arc time and operating factor are the three inputs that decide the answer, and all three are measurements rather than opinions. WeldTrace records current, voltage and wire feed speed at 25 kHz, and gas flow at 10 Hz, on every pass, so the arc time a job really took and the wire it really consumed come off the seam instead of off a quotation.