Does EN 1090-2 apply to your structure, and which execution class sets the welding, NDT and coordinator requirements? Scope decision flow and the records that evidence it.

Designation
EN 1090-2
Issued by
CEN
Title
Execution of steel structures and aluminium structures — Part 2: Technical requirements for steel structures
Edition
Confirm the edition your execution specification cites.

EN 1090-2 is an execution standard, not a design code. It states what has to happen on the shop floor and on site once a structure has already been designed and assigned an execution class — the welding procedures, the extent of nondestructive testing, and the welding coordination that class requires.

The recurring failure is treating “welded to EN 1090-2” as complete. The standard has four execution classes with materially different requirements, and the class is a design output, not something a fabricator picks for convenience. A specification naming the standard without the class has not actually specified anything measurable.

The second failure is scope drift: aluminium falls to EN 1090-3, and design questions belong to Eurocode 3, not this document.

Therness equipment sits underneath execution, not inside it: measured process records for structural steel welding, thermal evidence for the joints an execution class flags for closer inspection, and a per-weld record a notified body can review.

Scope: does it apply to your job?

Applies to

  • Steel structural components CE-marked under EN 1090-1
  • Welding, cutting and forming carried out during execution, shop or site
  • Selecting welding, NDT and coordination requirements by execution class EXC1-EXC4

Does not apply to

  • Aluminium structures, covered by EN 1090-3
  • Structural design and load calculation under Eurocode 3
  • Assigning the execution class itself, which the design does, not this standard

Applicability decision flow

Four questions that decide whether EN 1090-2 governs the joint
QuestionIf yesIf no
Is the structure steel, CE-marked under EN 1090-1?EN 1090-2 sets the execution requirements.Aluminium goes to EN 1090-3; work outside CE marking follows whatever the contract names.
Has an execution class, EXC1 to EXC4, been assigned?Use it to read off the welding, NDT and coordination requirements.The designer assigns it through the execution specification and Eurocode 3; settle this before fabrication starts.
Is the WPS qualified to EN ISO 15614-1, or drawn from a permitted pre-qualified route?Proceed with the class's other requirements.Qualify the procedure first; an unqualified WPS invalidates the execution record.
Does the assigned class and material group require a named Welding Coordinator?Name one under EN ISO 14731 before continuing; EXC2 and above always require it.Check the project specification rather than assuming EXC1 is exempt in every case.

What proves conformity, and what only supports it

Conformity is decided by inspection and testing against the criteria the standard and the contract set. The records below are evidence that the process was held where it was qualified; they support an inspection result, they never replace one.

Requirements of EN 1090-2 and the Therness record that evidences each
RequirementRecord producedSource
Evidence the process stayed inside the qualified window for the assigned execution classPer-weld voltage, current and wire feed records tied to the joint identifierWeldTrace
Targeting the NDT extent a class requires at the joints most likely to need itContinuous thermal record flagging per-weld anomalies ahead of inspectionHeatCam IR-C
A traceable record set a certification body can review at auditPer-weld export with identifier, operator and timestampHeatCore AI

Evidence the process, not just the paperwork

Therness records what the machine actually delivered on every weld — parameters, thermal signature and a per-weld trail — so a conformity argument rests on measurements instead of recollection.

Progetto cofinanziato nell'ambito del PR Piemonte FSE+ 2021-2027,
Priorità I, Obiettivo Specifico a), Azione 4 – "Sostegno alla nascita delle start up"