Weld monitoring for shipbuilding
High-volume welding under classification-society rules. The codes that apply, the four monitoring pain points that cost yards most, and which Therness signal addresses each.
ISO standard · reference card
Is the standard-level part of ISO 3834 the right fit? Decision flow against the comprehensive and elementary tiers, the codes it sits beside, and the records a Part 3 declaration depends on.
Part 3 sits in the middle of the ISO 3834 series, and that middle position is exactly where misclassification happens. A manufacturer moving up from simpler work reads Part 3 as “3834 without the heavy parts of Part 2” and treats its clauses as optional; a manufacturer moving down from comprehensive certification reads it as “3834 minus the paperwork” and drops records the standard still requires. Both readings miss that Part 3 is a complete quality-requirements standard in its own right — it carries the same clause categories as ISO 3834-2 at a reduced depth, proportionate to the work Part 1’s criteria route here, not a shorter list.
The clauses most often under-scoped at this level are inspection and testing, and identification and traceability — the same two clauses that matter most for ISO 5817 acceptance downstream. A Part 3 declaration still requires evidence that inspection happened during production, not only that a finished part looked acceptable, and still requires each weld identifiable to its welder and procedure. What differs from Part 2 is the extent expected, not whether the categories apply at all.
ISO 3834-5 then lists the further documents a Part 3 declaration has to satisfy — personnel qualification, procedure qualification, quality-management evidence — at the depth this part sets. Therness equipment produces the same shape of evidence whichever part governs: continuous per-weld records that satisfy Part 3’s inspection and traceability clauses without adding inspection headcount to a shop whose whole reason for choosing this tier was that comprehensive controls were not proportionate to the work.
| Question | If yes | If no |
|---|---|---|
| Does an application standard or contract already name Part 3? | Work to Part 3; the selection question is already closed. | Apply the Part 1 selection criteria before assuming Part 3 fits. |
| Does the work involve wide material ranges, thick sections or safety-critical service? | Part 2's comprehensive requirements are the more defensible route. | Part 3 may be proportionate to the actual product and process range. |
| Is the manufacturing scope simple enough that Part 4's elementary requirements would also be considered? | Compare against the Part 1 criteria directly — the two tiers are adjacent, not interchangeable by preference. | Stay with the standard requirements of Part 3. |
| Is structural steelwork under EN 1090-2 in scope? | The execution class named there drives the part; check the current mapping before defaulting to Part 3. | Continue applying the Part 1 criteria on their own terms. |
Conformity is decided by inspection and testing against the criteria the standard and the contract set. The records below are evidence that the process was held where it was qualified; they support an inspection result, they never replace one.
| Requirement | Record produced | Source |
|---|---|---|
| Inspection and testing evidence proportionate to Part 3's lighter but still real testing clause | In-process thermal and parameter records attached to the job, without adding a separate manual inspection step | HeatCore AI |
| Identification and traceability of welds and welders, required at every ISO 3834 level | Weld identifier, operator, timestamp and process record joined in one export | WeldTrace |
Therness records what the machine actually delivered on every weld — parameters, thermal signature and a per-weld trail — so a conformity argument rests on measurements instead of recollection.